1. #1

    How long does it take you to create a track?

    I want to know how long it took you guys to make your BEST track.

    I personally think my best track was Nostalgia. It took me around 12 hours to complete. Less than 10 seconds long.

    I'd also like to know how long you guys spend making your tracks in general. I find that the time can greatly vary if for example I hit my object limit without being finished with my track. I'll spend a lot of extra time trying to work around the object limit in order to finish the track.
    Share this post

  2. #2
    jook13's Avatar Senior Member
    Join Date
    Mar 2014
    Posts
    3,157

    Re: How long does it take you to create a track?

    I couldnt tell ya my "best" track. Stink Hole took me the longest, simply cause the cameras were a pain in the *** and testing took a long time with the whole no checkpoints thing. Somewhere around 20 hours or so. Most others take less than ten hours for me to make.
    Share this post

  3. #3
    Jarr3tt88's Avatar Senior Member
    Join Date
    Jan 2013
    Posts
    3,520

    Re: How long does it take you to create a track?

    My best tracks in my opinion are:

    High Tension = 50+ hours
    Rubber-crete = ~12 hours
    Threaded (First shot at an atmosphere track) = ~15 hours

    I would say I average 10-15 hours each track between all the testing. As always depends on the track and difficulty.
    Share this post

  4. #4

    Re: How long does it take you to create a track?

    40+ on average. Well over 50 on some.
    Share this post

  5. #5

    Re: How long does it take you to create a track?

    Over 50 hours Id say on most of the tracks Ive made recently anyways, probably spend most of that time playing the 1st checkpoint over and over again stoned off my head.
    Share this post

  6. #6
    nannerdw's Avatar Senior Member
    Join Date
    Jan 2013
    Posts
    1,268

    Re: How long does it take you to create a track?

    Pirate's Gold - 40-50 hours
    Average for other tracks - 15-25 hours
    Share this post

  7. #7

    Re: How long does it take you to create a track?

    I would say about 30 to 60 hours depending on figuring out what i wanted as the theme and the driving line.
    Share this post

  8. #8

    Re: How long does it take you to create a track?

    Between developing a theme, configuring obstacles, designing deco, endless testing, fighting the object limit and sometimes getting stuck on ideas I'd say it usually takes me a good 40-50 hours or more.
    Share this post

  9. #9

    Re: How long does it take you to create a track?

    I think i build pretty quick. When i have ideas in my head i usually have a lot of them, so i build constantly for a while and test it a lot. I'd say anywhere from 10-20 hours usually. Unless i have a lot of tweaking and such to do, or i dont like things and need to fix them, then maybe 25 at most.
    Share this post

  10. #10

    Re: How long does it take you to create a track?

    Usually 8-10 hours for me
    Edit: ****, didnt read the question haha, for my dlc entry it took me 30+hours(But it wasnt good) For river styx ride it took me around 12-14 hours
    Share this post