So I was thinking what if I build a trials hd track hidden inside of another hd classic. We all know the trials series is loaded with secrets and easter eggs galore so what better way to get back to the core of what we love. So get ready cause its definitely happening sooner than you think.
Hopefully the wait is almost over lol drive lines are done so deco an animations are all thats left. My goal was to hide a full 2 min track inside of a 30 sec track. I dont wanna reveal the track names just yet but Im hopeing to release them by end of next week 😁Originally Posted by UbiSc0ttie Go to original post
I'm not sure I understand your point my friend. Its a 30 sec hd track but you only have to run the 30 sec track, the other track is an easter egg thats totally optional. Trials has always been about hidden secrets from day 1 so its not gonna be easy to find but its there if riders wanna try to find it. I appreciate your concern and feedback.Originally Posted by TyrianMollusk Go to original post
Scenario 1: There are two separate tracks. Players can play whichever track they want, whenever they want. Scores, thumbs, etc are kept for each.
Scenario 2: There is one track with another inside it. Players can play one track by selecting it, but the other requires selecting the first track and then jumping through some hoops. Scores are only for the quicker track, not the other. Votes are for the amalgam for people who knew when they voted or just for the "obvious" track.
You're amused by (2). I get that. But it's not good for the tracks or for the players there for the tracks. It's just doing it to do it.
Your build, of course. I'm just advocating.
Ok gang I have a lil update. I'm going to go ahead and reveal the track names. The primary track is House of Horrors, I know its no surprise but its 1 of my all time favs. Inside of the house is 2 switches you gotta hit to unveil the hidden bonus track which is none other then the 1 bit trip. The hidden track is completely optional its just there for fun. All thats left is finish decorations in the house but even thats around 65-70% finished. My plan is to release it this coming friday (may 24th) so stay tuned and enjoy.
That would be cool, like first half could be Stock Market, and transition into Brown Boxes.Originally Posted by Smeghead89 Go to original post
I thought about making the Groundhog tracks as they were in HD, side by side. Only I would have used split drivelines and portals to teleport you from end of one to beginning of the other.
Never tried this yet so don't know how it will go.