Every country added after launch had their own season and map along with its two operators meanwhile Poland is gonna have no season or map and the Polish operators are gonna get jammed in alongside the 2 upcoming DLCs.
I don't think its fair to replace one country's season with Operation no refunds its a cheap way to disappoint the Polish fan base and get rid of an opportunity to make a great Polish map and season.The fact that instead of waiting to release the Polish season after Operation Health or all the other seasons Ubisoft has decided to just jam the Polish in like they don't matter much its really unfair and it paints an image of Ubisoft being against launching a Polish season which in my opinion Poland deserves seeing as every other country was treated fair and with respect.I know its not going to change anything but i really hope that Poland gets a well made and well deserved season and a good map.
Originally Posted by Artuditu211 Go to original post
This has nothing to do with people hating the Polish operators, the Polish map is coming apparently and is being made just not this year
https://www.reddit.com/r/Rainbow6/co...at_we_get_the/
True. Let's just not fix our bugs and upset everyone instead of one guy who takes it personally that they had to fix bugsOriginally Posted by Artuditu211 Go to original post
the Polish map is being made according to the 4Chan leaker just it won't release anytime soon.Originally Posted by Isdrake Go to original post
I agree wholeheartedly 100% and I'll bet Ubi will say the exact same thing. It's unfair but what else could they do If they still wanted to launch Year 3 on time.Originally Posted by Artuditu211 Go to original post
It's a fact that If they didn't push back something then Everything would be completely off schedule..and that is something nobody can afford. Could they have dismembered another season to accommodate the Polish season that was 'supposed to happen' for season 2? Nope..they couldn't. They would have to launch GROM. and the 2 extra operators from whichever season they knifed..they can not release an operator that had her season launch already. catch 22 really but the least amount of hassle would have been what they did.
The remaining 3 seasons (that need to be crammed into 2) map design and layouts might have something to do with the Polish choice. Or the operators not being ready on time could have been another deciding factor. It could have also been things such as how much time they need to give outside contractors to stage events pertaining to each season. I know people in the biz and sometimes these things can take months to plan/build. They might have been contractually obligated in other regards. It also could be none of these things and that they literally just flipped a coin. I doubt it though. The Polish map and ops were probably the closest to launch than s3 and s4's ops/maps. So..I'm thinking that some of the boys working there might appreciate a job while op health was taking stage. I'm sure they didn't stop ALL production for s3/4 right? They have to have something to do when they clock in other than gathering around the watering hole.
Then again..you could be right and Ubi doesn't like Polish politics or something and said screw'em. But don't you think keeping within a structured timeline would make more sense?
I'm NOT trying to justify anything nor am I trying to suggest that Ubi didn't botch R6's structure in the first place, but hindsight is 20/20 as they say.