1. #11
    flooodi's Avatar Senior Member
    Join Date
    Aug 2014
    Location
    Finland
    Posts
    1,211
    Originally Posted by dprotect Go to original post
    But in that case that there are many People that have over 200K Chips and you start a new line of bunker tracks, which are on costs like the old one (500, 1000, 1500 ...) then
    they would spend all Chips in one time, got all new tracks, cause they got so many Chips to buy it.

    And the effect would be the same like now, - waiting again for new tracks - and no one had some real Point to play the bunker.
    For the new People it this a good idea, cause everyone want to have many tracks, but if yuu want bring life in the bunker, then they would not do it that way.

    For me as exampe, it would be good if they continue at 45000 or what the last track costs was, then you have a Point to Play the bunker to grind Chips an get the track.
    How many "not so dedecated" players would continue getting the tracks above TT?
    - 40k chips was a big issue even for me, and back then there was pingpong.
    - TT is quite hard for casual players, and the line vent harder and harder from track to track. I don't think they want even harder tracks with too much of work to get it.
    - TT has 2168 players on Anroid, would RL make new track just for those, when the playerbase is quite a bit larger.

    I'd like more second line side by side with the old one, and possibility to buy both lines at the same time. Even tho I could buy all the tracks at once.
    This way it would be more fair to those which don't have all the old bunker tracks.
    Share this post

  2. #12
    Chemical-TBR's Avatar Member
    Join Date
    Jul 2015
    Location
    Canada, eh
    Posts
    474
    Originally Posted by flooodi Go to original post
    How many "not so dedecated" players would continue getting the tracks above TT?
    The way the line is on the map right now i don´t see how they can fit more than 1 new track after TT. They´d have to change the line. Maybe they only have plans for 1 new track...

    Or they could make a whole new line on the ferry map, wouldn´t that be sweet? A whole new set of bunker tracks starting at a low chip price somewhere on the ferry map... Who´s up for that?
    Share this post